Wall tiling quotes
Replace loose, cracked or mould-stained wall tiles when water can reach the substrate, surfaces are unsafe to clean, or the finish no longer suits the room. Wall tiling involves preparing the backing, selecting compatible tiles and adhesive, fixing them accurately, then protecting joints with grout and suitable sealant.
What this covers
The work normally begins with removing existing tiles or preparing a bare wall, protecting nearby fittings and checking that the backing is sound, dry enough for the chosen system and capable of carrying the finish. Loose plaster, contaminated surfaces, damaged boards and uneven areas may need repair or replacement before tiling starts.
The installer then measures the room, establishes a level datum, plans cuts around corners and openings, and considers where full tiles should be seen. Adhesive is spread over a controlled area, tiles are pressed into place with consistent joints, and cuts are made around sockets, pipes, windows and sanitaryware. Corners and changes of plane need suitable trims or movement details rather than brittle filled gaps.
After the adhesive has cured, joints are grouted and the perimeter is sealed where water or movement is expected. The completed work should include cleaning adhesive residue, checking alignment and making good around removed fittings. Wall tiling can be decorative, protective or both; it does not correct structural movement or cure damp behind the wall.
How the work is done
The installer first discusses the room, tile choice, desired layout and any restrictions around plumbing, electrics or occupied areas. Existing fittings and floor surfaces are protected, then old tiles, adhesive and loose material are removed where necessary.
The wall is inspected for damp staining, movement, hollow plaster, weak plasterboard and contamination from paint or grease. Repairs, levelling or board replacement are completed before setting out. A reference line is marked so the courses remain visually balanced, particularly around worktops, baths and windows.
Tiles are cut and fixed in manageable sections with the specified adhesive, using spacers or the chosen joint system. The installer checks faces, corners, reveals and penetrations as the work progresses rather than relying on grout to disguise errors. After curing, joints are filled, perimeter gaps are sealed and trims are cleaned. Fittings may then be refitted, silicone renewed and the area inspected for lippage, cracked tiles, open joints or adhesive residue.
What affects the cost
The main cost drivers are preparation, tile complexity and the amount of cutting. Removing firmly bonded tiles can expose damaged plaster or boards, while levelling a bowed wall adds labour before any finish is installed. Small mosaics, hard porcelain, natural stone, patterned layouts and numerous penetrations take longer to set out and cut than straightforward rectangular tiles.
Access also matters. Tight bathrooms, occupied kitchens, upper-level work areas and rooms requiring extensive protection can slow handling and cleaning. Quotes may differ according to whether adhesive, grout, trims, sealant, waste removal, fitting removal, substrate repairs and making-good are included. Tile supply, delivery and breakage responsibility should be clear, especially for fragile or batch-sensitive materials.
A useful quotation identifies the measured area, tile specification, adhesive and grout system, preparation allowance, edge details and exclusions. It should explain what happens if concealed damage is found after removal, rather than treating every wall as ready to tile.
Before you hire
For wall tiling, useful evidence is a clear explanation of substrate checks, tile compatibility and how corners, penetrations and changes of plane will be finished. Ask how the installer handles plasterboard, natural stone, large-format tiles and wet-area junctions if those conditions apply. A competent quotation should distinguish preparation, fixing, grouting, silicone, trims, waste and making-good, and should state how concealed damage will be treated. Photos are most helpful when they show straight setting out, neat cuts around fittings and durable junction details rather than only the finished room.
Recent work
Tiling project 1
Tiling project 1
A warm, modern family bathroom.
Bathroom basin with cabinet underneath
Tiling project 2
Tiling project 2
A modern family bathroom.
Bathroom project
Tiling project 3
A stylish family bathroom renovation.
Bathroom installation
Tiling project 4
A modern grey and brass family bathroom.
Bathroom project