Floor tiling quotes

Floor tiling replaces or lays tiles over a prepared floor to create a durable, washable surface and correct problems such as cracked tiles, worn finishes or water-prone joints. The work may involve removing old tiles, levelling the substrate, choosing suitable adhesive and sealing movement or perimeter joints.

What this covers

The work starts with inspecting the existing floor, checking for movement, moisture, unevenness and weak areas, then deciding whether tiles can be laid over the background or whether the covering must be removed. Loose tiles, adhesive residues and contaminated surfaces are taken out where necessary. The substrate is repaired, cleaned and levelled so the finished surface does not reproduce dips or ridges.

The installer then plans tile positions around walls, thresholds, door openings, cabinets, drains and visible sightlines. Tiles are cut with suitable equipment, fixed into compatible adhesive and pressed into an even bed. Spacers or a planned joint size maintain alignment, while perimeter and movement joints allow controlled movement instead of forcing tiles against fixed edges. Grout is applied after the adhesive has set, followed by cleaning and, where appropriate, sealing.

Scope varies from a small replacement area to a complete floor build-up involving removal, moisture management, levelling compound, backer boards or repairs to the underlying structure. Existing skirting, sanitaryware, kitchen units and thresholds may restrict access and affect the finished junctions.

How the work is done

First, the tradesperson inspects the room, existing covering and substrate, noting hollow areas, cracks, damp indications, height changes and access restrictions. You should agree what remains in place, what is removed and how waste, appliances, doors and skirting will be handled.

Old tiles and adhesive are lifted where they are loose, damaged or unsuitable as a base. The exposed floor is vacuumed and checked for movement. Holes, weak patches and uneven sections are repaired or levelled; a primer, waterproofing system or decoupling layer may be specified where the substrate and location justify it.

The layout is set out before fixing, using the room's sightlines and the positions of thresholds, cabinets and fixtures. Tiles are cut, adhesive is spread in manageable sections and each tile is bedded with consistent coverage. After curing, joints are grouted, perimeter gaps are finished appropriately and surfaces are cleaned. The final check covers lipping, alignment, hollow sounds, damaged edges, open joints and door clearance before the room is handed back.

What affects the cost

The main cost drivers are the area, tile format, material, layout and condition of the existing floor. Removing firmly bonded tiles takes more labour than laying over a sound, compatible surface, while adhesive residues, damp-affected areas, cracks or unevenness can require additional preparation before fixing starts.

Access also changes the scope. Narrow entrances, occupied rooms, heavy appliances, fitted units, stairs and difficult waste routes increase handling and protection. Intricate borders, diagonal layouts, many cuts and tiles that require specialist cutting create more setting-out and installation time than a simple open floor.

The specification should make clear whether tiles, adhesive, grout, trims, primers, levelling products, waterproofing, protection, waste removal, moving contents and making-good are included. Ask how changes will be handled if the substrate is worse than it appeared. A useful comparison separates preparation from installation, identifies the selected system and states any work excluded around skirting, doors, units or plumbing fixtures.

Before you hire

Job-specific competence shows in the questions asked before a quote: what lies beneath the existing floor, where movement or moisture may occur, how thresholds will finish and whether fixtures restrict the layout. A capable installer can explain why a tile, adhesive, grout and preparation system suit that room rather than presenting one standard specification.

Look for a method that includes substrate testing, planned set-out, consistent adhesive coverage, perimeter movement provision and protection of adjoining finishes. The completed work should show even joints, sound edges, clean transitions, secure thresholds and no unexplained hollow areas. For a repair, the explanation should address the cause of failure, not just the replacement tile.

Recent work

Get Floor tiling quotes