Floor screeding quotes
Uneven, cracked or poorly prepared floors usually need screeding before the final covering is fitted. The work creates a level, stable surface over a concrete base, insulation or underfloor heating, helping tiles, timber and resilient flooring sit correctly and reducing movement, hollow spots and premature failure.
What this covers
The job starts with exposing and inspecting the structural floor or existing base. Loose material, dust, adhesive, laitance and contamination are removed, while cracks, damp and level changes are recorded. The screeder then sets reference levels, protects adjoining areas and installs edge insulation or movement joints where the floor design requires them.
A cementitious or calcium sulphate screed is mixed and placed to the specified depth. It may be bonded directly to concrete, separated with a membrane, or laid as a floating layer over insulation. Where underfloor heating is present, pipes or cables must be fixed, pressure-tested where appropriate and fully surrounded without damaging them. The surface is ruled, compacted and finished to receive the chosen covering.
Screeding is not a substitute for repairing structural movement or solving rising damp. The specification must account for floor height, door clearances, thresholds, stairs and adjoining rooms. Drying and moisture testing remain part of the work before decoration or flooring installation proceeds.
How the work is done
First, the contractor confirms the finished floor level and checks the existing base for movement, contamination, damp and weak areas. Furniture, flooring and vulnerable fittings are removed or protected, and the work zone is separated from occupied rooms.
The base is cleaned, repaired and primed where a bonded system is specified. A membrane, insulation and perimeter edging are installed where the design calls for a floating or separating screed. Reference markers establish the required depth, including space for the final covering. Underfloor heating is secured and checked before placement.
The chosen mix is delivered, pumped or barrowed into position, then compacted and levelled with straightedges or specialist equipment. Edges, thresholds and service penetrations are finished carefully. The surface is protected from traffic, draughts and rapid drying while it cures.
After curing, the contractor checks flatness, visible cracking and moisture. High spots may be abraded and isolated defects repaired, but widespread failure usually requires investigation before flooring is installed.
What affects the cost
The main cost drivers are the floor area, specified depth and quantity of material, because deeper or irregular build-ups require more product and handling. Preparation can add substantially where adhesive, laitance, damaged concrete or old screed must be removed before the new layer will bond.
Access affects labour and logistics. Upper floors, narrow entrances, occupied homes and limited parking may require additional movement of materials or pumping arrangements. Insulation, membranes, perimeter edging, reinforcement, movement joints and underfloor heating protection also change the specification.
The final price should make clear whether it includes surveying levels, moisture testing, primers, protection, waste removal, pump access, curing protection, surface sanding, remedial work and making good. Fast-drying or specialist screeds may cost more because of their formulation and tighter installation controls. Ask how the quoted work deals with unexpected damp, structural cracks or a base that fails inspection, rather than accepting an allowance that hides the decision.
Before you hire
For this work, useful evidence is a clear explanation of bonded, unbonded and floating construction, with the choice linked to the substrate and finished floor level. A competent screeder should discuss moisture testing, movement joints, drying protection and the compatibility of the proposed covering.
Ask how underfloor heating will be protected, how the base will be accepted before placement and how flatness will be checked afterwards. On an active construction site, CSCS credentials may be relevant to site access. For older floors, the contractor should identify suspected asbestos-containing textured coatings before preparation disturbs them.