External wall insulation (EWI) quotes
External wall insulation adds an insulated layer outside the masonry, then protects it with reinforced render or cladding. It suits walls that lose heat, feel cold internally or need weather protection, but requires checks on damp, roof overhangs, windows, gutters, fixings and planning constraints before installation.
What this covers
The job starts with surveying the external walls, checking for cracks, blown render, damp paths, unstable masonry and details that may obstruct the new thickness. Existing gutters, downpipes, vents, cables, satellite equipment, meter boxes and external lights may need temporary removal or extension. Windows, doors, sills, eaves, plinths and roof edges require designed junctions so rainwater cannot enter behind the system.
The wall is cleaned and repaired before insulation boards or a compatible mineral-based system are fixed mechanically, with adhesive used where the specification permits. Openings receive reinforced corners and mesh; the whole surface gets a basecoat containing reinforcing mesh before a primer and final render or cladding finish. The installer must maintain ventilation openings and avoid bridging damp-proof courses.
At completion, fixings, beads, mesh overlaps, render thickness, movement joints, sealant and drainage details should be checked. Decoration follows only after the system has cured sufficiently. Listed buildings and conservation areas may require lime-compatible thinking and careful approval of the external appearance.
How the work is done
A survey first records wall construction, exposure, cracks, damp, existing coatings, roof edges, openings and attached services. The provider then confirms the insulation build-up, finish, junction details, access plan and any permissions or testing needed.
Scaffolding or another safe access system is erected, and vulnerable areas are protected. Loose render is removed, masonry is repaired, contaminated surfaces are cleaned and the wall is allowed to dry where the specification requires it. Gutters, pipes, vents, lights and other fittings are removed or marked for alteration.
Boards or mineral insulation are fitted in a staggered pattern, fixed to the substrate and cut tightly around openings. Corner beads, mesh patches and movement details reinforce vulnerable areas. A basecoat embeds the main mesh, followed by primer and the selected render or cladding finish.
The final inspection checks thickness, alignment, reveals, seals, drainage, vents, fixings and reinstated services. Scaffolding comes down after adequate curing, and the owner receives product and maintenance information before decoration or other follow-on work begins.
What affects the cost
The main cost drivers are wall area, height, access, substrate condition and the thickness and type of insulation. Scaffolding, edge protection, hoisting, protection of paths and neighbouring surfaces, and restricted working space all affect the installation effort.
A straightforward elevation costs less to organise than a property with bays, dormers, conservatories, stepped walls, narrow passages or numerous service penetrations. Repairs to cracks, unstable render, defective pointing or damp masonry must be completed before insulation, and extensive preparation increases labour and materials.
The specification also changes the total: mineral wool, wood fibre, specialist breathable finishes, brick slips and rainscreen systems have different fixing, support and finishing requirements. Altering sills, roof trims, gutters, downpipes, vents, cables and meter boxes adds separate detailing. Ask whether surveys, system design, scaffolding, waste removal, making-good, testing, permissions and maintenance information are included rather than comparing a headline installation figure alone.
Before you hire
A capable EWI provider should explain the wall build-up, moisture risks, insulation thickness, fixing pattern and junction details rather than quoting only a finish. Look for a survey that records substrate condition, damp-proof courses, eaves, openings, vents and attached services. Their proposal should identify the system manufacturer, reinforcement, basecoat, finish and curing requirements.
Useful evidence includes drawings or marked-up details for windows, sills, roof edges, plinths and downpipes, plus a clear method for repairing defects before insulation. On active construction sites, CSCS arrangements may affect site access. The provider should also recognise when asbestos testing is needed before disturbing older textured coatings and when lime-compatible materials deserve consideration.