EICR and electrical testing quotes
Arrange an EICR when you need the condition of an installation assessed, a fault is suspected, or safety evidence is required for a property decision. Testing identifies damaged wiring, ineffective earthing, overloaded circuits and defective protective devices, then records observations and recommended remedial work.
What this covers
The work starts with information gathering: the electrician asks about known faults, alterations, previous certificates and areas that cannot be accessed. They inspect the consumer unit, visible cabling, sockets, switches, light fittings, bonding and other accessible parts for damage, unsuitable alterations or signs of overheating. They then isolate circuits where necessary, prove them dead, and carry out tests covering continuity, insulation resistance, polarity, earth fault loop impedance and operation of protective devices, subject to the installation and safe access available.
An EICR records observations against BS 7671 inspection and testing principles, classifying defects by their potential safety significance rather than presenting every recommendation as an emergency. Testing may expose a loose connection, borrowed neutral, damaged cable, inadequate bonding, nuisance tripping or an RCD that does not operate correctly. The report should identify limitations, affected circuits and recommended action. It is an assessment of the installation at the time of inspection, not a guarantee that hidden or inaccessible defects do not exist.
How the work is done
The electrician first discusses the reason for the visit, known symptoms, previous alterations and any circuits that must remain available. They agree access requirements and note areas that cannot safely be examined. Power may need to be isolated, so sensitive equipment should be shut down and arrangements made for alarms, refrigeration or other essential loads.
Inspection follows at the consumer unit, accessories, visible wiring, bonding points and accessible equipment. The electrician looks for heat damage, loose covers, exposed conductors, unsuitable connections and signs of amateur alteration. They label or trace circuits where identification is unclear.
After isolation and proving dead, they perform the relevant electrical tests, restore supplies safely and investigate abnormal results. Some tests can disturb electronic equipment or reveal a defect requiring immediate isolation. The completed report records circuit details, limitations, observations, classifications and test results. If remedial work is proposed, it should be explained separately so you can distinguish the inspection from repairs.
What affects the cost
The main cost drivers are the installation’s size, number of circuits, property layout and the amount of access available. A straightforward, clearly labelled consumer unit and accessible accessories take less investigative time than an altered installation with uncertain circuit routes, inaccessible voids or missing records.
Cost also rises where testing requires repeated isolation, specialist access, investigation of abnormal readings, removal and refitting of fittings, or coordination around essential equipment. Remedial work is separate in scope: replacing an accessory differs from tracing a concealed cable fault, upgrading protective arrangements or renewing a circuit. Consumer-unit work may involve additional testing and making-good.
Ask for the quote to state the inspection scope, areas excluded, report supplied, access assumptions, isolation requirements, waste disposal and whether faults or repairs are included. A low initial figure may not cover tracing unidentified circuits, opening surfaces or returning to complete remedial testing, so compare like-for-like scope rather than the headline amount.
Before you hire
For this job, look for an electrician who can explain the test scope, isolate circuits safely, prove dead, interpret readings and record limitations accurately. Ask which parts of the installation will be inaccessible and how that affects the conclusion. The report should identify observations by location or circuit, use appropriate classifications and include relevant test results rather than vague statements.
Where the work connects with a wider building alteration, ask how Part P considerations apply to the proposed electrical work. NICEIC or NAPIT registration can be a useful competence signal, but the specific assessor’s testing method, experience with the property type and clarity about remedial recommendations still matter.