Decking quotes

Choose decking when you need a usable outdoor surface over grass, uneven ground or a tired patio. The work creates a framed platform with supporting joists, fixed boards, steps and edge details, solving access, drainage and seating problems while giving the garden a defined, maintainable surface.

What this covers

The work starts with measuring the proposed area and checking levels, soil condition, drainage, boundaries and access for materials. Existing turf, paving or a failed deck may need removing, with roots, standing water and unstable ground dealt with before construction. A supporting substructure is then formed from treated timber or another specified system, using posts, pads or adjustable supports and joists arranged to carry the board pattern. Joists need ventilation and separation from persistent damp, while the frame must remain stable without damaging walls or bridging damp details.

Boards are cut around posts, drains, inspection points and edges, then fixed with suitable screws or clips. The installer forms steps, balustrades, fascias, ramps or privacy screens where required, keeping transitions safe and practical. Finishing includes trimming exposed ends, checking screw heads, clearing waste and explaining care. On a raised deck, the underside and support points matter as much as the walking surface because concealed decay can weaken the structure before damage is obvious.

How the work is done

The first visit establishes what the deck must do: provide seating, bridge a slope, connect a doorway or replace an unsafe surface. Measurements record finished height, boundaries, drainage routes, thresholds and likely material access. The existing ground is then cleared, with turf, roots, old paving and unstable fill removed where they would undermine the frame.

Next, the installer sets out support points and builds the substructure, keeping timber clear of standing water and allowing air movement beneath boards. The frame is levelled or deliberately stepped, then checked for rigidity before boarding begins. Boards are acclimatised where appropriate, cut around obstacles and fixed with the specified screws or hidden clips. Edge boards, fascias, steps and balustrades follow, with gaps maintained for drainage and movement.

Finally, the surface is checked for proud fixings, sharp cuts, rocking boards, trip edges and water traps. The area is swept, waste removed and any disturbed ground or paving made good. The handover should explain cleaning, coating, inspection points and any limitations created by the site.

What affects the cost

Decking costs are driven first by area and complexity, but the visible board coverage is only part of the work. Removing an existing deck, concrete or dense roots requires more labour and disposal. Sloping, wet or unstable ground can require additional excavation, drainage measures, deeper supports or more extensive levelling. Restricted side access increases handling and may limit board lengths or delivery methods.

Material selection changes both supply and installation effort: hardwood can require different cutting and fixing, composite needs accurate joist spacing, and intricate board patterns create more waste and cutting. Raised platforms cost more to construct than simple ground-level layouts because posts, beams, steps, guarding, fascias and underside access add components. Curves, multiple levels, benches, screens, ramps and built-in lighting increase setting-out and finishing work.

A useful quotation should identify preparation, substructure, boards, fixings, edge details, steps, waste removal, protection of adjoining surfaces and making good. It should also state assumptions about access, ground conditions and any drainage or structural work excluded.

Before you hire

Useful job-specific evidence includes drawings or photographs showing joist layouts, steps, edge details and drainage solutions rather than only finished surfaces. A competent installer should explain how supports avoid persistent damp, how board movement is allowed for, and how access covers or air bricks remain usable. Ask for the proposed fixing system, timber treatment or composite installation requirements, and the inspection plan for raised areas. Their quotation should distinguish substructure repairs from board installation, identify assumptions about ground conditions, and state how waste, trims, balustrades and making good are handled.

Recent work

Get Decking quotes