Acoustic plasterboard quotes
Choose acoustic plasterboard when airborne noise needs reducing without building a separate masonry wall. The work normally involves fixing sound-rated boards to a suitable frame, sealing joints and finishing the surface for decoration. The result depends on airtight detailing, adequate depth and controlling sound paths through floors, ceilings and openings.
What this covers
The work usually creates a new lining in front of the existing wall, ceiling or sometimes a partition. The contractor first checks for damp, loose plaster, concealed cables, pipes, sockets, skirting and uneven masonry. A metal or timber frame may then be fixed with suitable separation from the original structure, allowing acoustic mineral wool to occupy the cavity without being compressed. Acoustic plasterboard is screwed to the frame, often in more than one layer where the design requires additional mass. Joints are staggered, perimeter gaps are sealed with acoustic sealant, and penetrations for sockets or services are kept airtight. The surface is taped, jointed or skimmed, then prepared for decoration. This can reduce airborne transmission, but it will not independently stop every impact sound or vibration. Doors, floors, ceilings, chimney breasts and adjoining walls may carry sound around the treated area. The scope therefore includes diagnosis and detailing, not simply attaching a board over the visible surface.
How the work is done
The contractor begins by discussing the noise, its direction, timing and whether it is airborne speech or impact vibration. They inspect both sides where possible, check the wall construction, measure available room depth and locate electrical or plumbing services. Loose finishes, skirting and obstructions are removed or protected. A frame is set out, with resilient separation or suitable fixings where specified, and mineral wool is cut to fit the cavity without gaps or compression. Acoustic plasterboard is fixed with staggered joints; additional layers may be added with joints offset between boards. Socket boxes and service penetrations are positioned carefully, while perimeter joints, corners and board interfaces are sealed. The lining is taped, jointed or skimmed, then allowed to dry before decoration. Skirting, architraves, sockets and radiators are refitted, with gaps around them sealed where appropriate. The contractor should explain what the build-up addresses, what sound may still travel through, and which making-good tasks are included.
What affects the cost
The main cost drivers are the area treated, the number of board layers and the depth of the framing system. A lining that needs mineral wool, resilient clips, acoustic sealant and carefully enclosed sockets involves more materials and detailing than board fixed to a prepared surface. Access affects labour where furniture, fitted cupboards, radiators or fragile finishes must be removed and reinstated. Uneven masonry, damp, loose plaster and concealed services can add preparation or rerouting work. Quotes also differ according to whether they include skirting removal, electrical alterations, door adjustments, plaster skim, decoration, waste disposal and final making-good. High ceilings, stair access and occupied rooms can increase handling and protection requirements. If a separating wall is involved, the proposed build-up may need more precise detailing for Part E performance. Ask for the layers, thickness, edge sealing, service treatment and exclusions to be written down rather than comparing a board-only description with a complete acoustic system.
Before you hire
A capable installer should explain the sound path before recommending a board, distinguish airborne noise from impact vibration and provide the complete layer sequence in writing. Look for accurate setting out around sockets, doors and skirting, mineral wool fitted without voids, staggered joints and continuous perimeter sealing. The contractor should identify concealed-service risks, discuss room-depth loss and recognise when a pre-2000 textured coating needs asbestos testing before disturbance. For separating walls, ask how the proposed build-up relates to Part E considerations. On an active building site, relevant CSCS arrangements may also matter.